Plan the machines. Record the output. See the real cost.

Production Floor turns a sales order into a job card on a specific machine, issues material from the BOM, and records good output, rejection and scrap shift by shift. You see actual cost per unit, not a guess.

Per shift
output and rejection
Multi-level
bills of materials
Actual
cost per unit
Production Floor / Job cards
Job cards
+ New
Running jobs
11
Rejection this week
2.3%
Machine utilisation
78%
Job cardItemMachineTargetGoodStatus
JC-4410PP clip 12 mmM-320,40020,033Completed
JC-4411HDPE cap 28 mmM-150,00031,200Running
JC-4412ABS knobM-58,0000Planned
JC-4409PET jar 500 mlM-212,00011,540QC hold
JC-4410 rejection 1.8% (flash, short shot)
How work moves

From the first entry to the last, in order.

01
Plan

Order assigned to a machine and date.

02
Issue

BOM quantity issued from stores.

03
Produce

Output and rejection per shift.

04
Inspect

Final QC before finished goods store.

05
Cost

Material, machine and labour per unit.

What Production Floor does

Built for the way a small factory or trading desk actually works.

Bills of materials

Multi-level BOMs with alternates, scrap allowance and routing through operations and machines.

Machine planning

See load on each machine by day. Drag a job to a free slot and the promised date updates.

Job cards

Printed or on a tablet at the machine, with material issued, operator, shift and target quantity.

Output entry

Good quantity, rejection with reason, and downtime with cause, entered per shift in under a minute.

Scrap and regrind

Track scrap by type and reuse regrind where your quality rules allow it.

Job work

Send operations outside, track material at the vendor and receive finished goods with charges.

In detail

The parts that save the most time.

01

Plans that match the floor

  • Machine and mould availability
  • Changeover time between jobs
  • Shift calendar and holidays
  • Promised date updated when plans move
02

Shop floor entry that people use

  • Big-button tablet screens at the machine
  • Hindi and English labels
  • Rejection reasons from a fixed list
  • Downtime with cause and duration
03

Costs you can act on

  • Actual vs standard material per job
  • Rejection cost by item, machine and shift
  • Machine hour rate and labour cost
  • Job profitability against the sales price
Questions

Production Floor, answered.

We are not a process-heavy factory. Is this overkill?

Start with BOM and material issue only. Machine planning and shift entry can be switched on later.

Can operators enter output in Hindi?

Yes. Shop floor screens support Hindi and English, with large buttons for gloves and tablets.

Do you support make-to-stock?

Yes. Production can run against a sales order or against a stock replenishment plan.

Can we track moulds or dies?

Yes. Moulds and dies can be set as resources with shot counts and maintenance reminders.

End of the day

Tomorrow's first order can run through one handle.

Job card / Go-live
No. 0001
Job
Move the business onto one ERP
Customer
Your company
Week 1
Masters, opening stock and balances imported
Week 2
Invoices, POs and job cards running live
Week 3
Copilot, dashboard and Tally export switched on
Cost to start
Nothing for 30 days. No card needed
tear here
Stub / keep this
30 days. Full access. One company.

Data import help included. Your team keeps working while we set it up.